North America News Worldwide News
Oil Companies Eye Crude Price Drop But Keep ... Billionaire Fredriksen's Partner Quits Rig F...
Significant Water Recycling Achieved in Eagl... Wild Well Control Locates New Subsea Capping...
US Crude Falls On Worries About Glut, Brent ... Lukoil CEO Says Russian Output Will Not fall...
Range Resources To Pay $4M Drilling Waste Fi... Pingvin Well Finds Gas in Barents Sea
ExxonMobil Extends Permian Position Newbuild Bhagwan Dryden DSV to Commence 5 Ye...
Oil Falls On Supply Glut And Strong Dollar Pertamina to Deploy New Rig to Drill at Alge...
North Dakota Governor Sees Oil Production Di... Key Oil, Gas Figures Welcome Scotland's 'No'...
Petronas Still Eyeing Year End For Canada LN... Egypt Awards Oil and Gas Exploration Blocks
Chevron Meets New, Voluntary Shale Drilling ... Petrobras Says to Sign Libra Production Ship...
Republican Senator Says 2015 Could Be Time F... Searcher Seismic Commences Mialara 2D Seismi...
Ambitious US Pipeline Firm Buckeye Quietly M... Stena Clyde to Drill Pryderi-1 Well in Permi...
The Next Logical Step For Natural Gas Suppli... Development Drilling at PNG LNG Project's Hi...
Continental Resources Names New President Af... Facing US Sanctions, Exxon Winds Down Drilli...
Oil Prices Fall On EIA Report Of Big US Crud... Wartsila Covers The Full Scope Of Making Gas...
Northern Drills First Wells in Current Progr... GE Oil & Gas Wins Subsea Manifold Deal with ...
Bill Barrett To Sell Gas Assets, Buy Oil Pro... Libya's Zawiya Refinery, El Sharara Oilfield...
More North America News More News
Sponsors
Sponsors





Career Center
Company / Job Opening Location Date Posted
EdgeMarc Energy
Senior Facilities Engineer
Canonsburg Sep 19
EdgeMarc Energy
Senior Production Engineer
Canonsburg Sep 19
EdgeMarc Energy
Senior Reservoir Engineer
Canonsburg Sep 19
EdgeMarc Energy
Business Development Director
Canonsburg Sep 19
CCL Contract Consultancy Inc
Installation Engineer
Houston Sep 19
CCL Contract Consultancy Inc
Project Support Specialist
Houston Sep 19
CCL Contract Consultancy Inc
Lead Mechancal Engineer
Houston Sep 19
CCL Contract Consultancy Inc
Electrical Engineer
US Sep 19
EdgeMarc Energy
Field Superintendent
Canonsburg Sep 19
R&R Energy Services
Electrician/Electronics Tech/Instrumentation Technologist
Gom,Land,Inland Waters Sep 19
Recruiting Source International, LLC
Corporate Recruiter
Houston Sep 19

Featured Job
Company: Omega
Location: Bloomsfield, NM and Andrews, TX
Experience: 15+ Years
Education: Bachelors/3-5 yr Degree
Desired Expertise:
Executive, Operations Manager
View this Job

Featured Offshore Project
September 18   |   Greater Stella Area   |   Region: Europe - North Sea   |   Operator: Ithaca Energy
Flow testing of the fourth Stella field development well is complete. Well 30/6a-B2Z was drilled to 14,461 feet with a 2,396-foot gross horizontal reservoir section. The well exposed 1,658 feet of Paleocene reservoir. The flow test was conducted over a 38-hour period and achieved a maximum rate of 12,005 boepd which accounted for 5,901 barrels of oil and 36.6 MMscf of gas. Once the well is suspended, the Ensco 100 (350' ILC) will mobilize to the main drill center to drill a fifth development well targeting oil in the Ekofisk chalk formation. Completion of the well will mark the end of the Stella development drilling program. Participants in the development include operator Ithaca Energy (54.66%), Dyas E&P (25.34%) and Petrofac (20%). More Offshore Projects
Latest Rig Data Updates
September 10   |   UMW Naga 6   |   375 ft.   Jackup
UMW Offshore Drilling Sdn Bhd received a Letter of Award from Petrovietnam for the provision of a jackup that will carry out a drilling program for Petronas Carigali offshore Vietnam. UMW will supply the Naga 6 (375' ILC) which is currently under construction at the China Merchants yard in Shenzhen, China. The estimated $46.5 million contract consists of 4 firm well that should take approximately 250 days to drill. Three optional wells are included at 55 days each along with a 3-well Extension Option that could keep the rig working for an additional 277 days. The rig is expected to be delivered near the end of September and the contract will start in October. The UMW Naga 6 is a CJ46-X100-D design and can drill to a depth of 30,000 feet.
September 11   |   Prospector 1   |   400 ft.   Jackup
The Prospector 1 (400' ILC) has been waiting on location earning a reduced dayrate near the Franklin platform in the U.K sector of the North Sea while operator Total prepared the platform to accept the rig. Those preparations have been made and as of September 5 the rig is being compensated at the mobilization rate specified in the original contract.
more offshore rig activity updates
EQUIPMENT MARKETPLACE
Dragon Frac Tanks 500 BBL flat top
Location: WEST TEXAS
Condition: USED
Price: $19,500 EACH
I am selling Dragon frac tanks 500 BBL, Flat Top, DOT ready. These units have been slightly used and there are some still brand new, i have ...
More Equipment

INDUSTRY EVENTS