EQUIPMENT MARKETPLACE
SEARCH EQUIPMENT
SUBSCRIBE
Category: Coiled Tubing Unit Ads
Your Equipment Criteria:  Category: Coiled Tubing Unit
  

22 ads found    Page 1 of 1

For Lease: Unit OF-118: 2012 Total Equipment & Service 2-inch coiled tubing unit
Used Total Equipment & Service 2" coiled tubing unit A cost- and time-effective solution for well intervention operations employs coiled tubing. Instead of removing the tubing from the well to fix a problem like a workover rig, coiled tubing is inserted into the tubing against the pressure of the well and during production. The coiled tubing is a continuous length of steel or composite tubing that is flexible enough to be wound on a large reel for transportation. The coiled tubing unit is composed of a reel with the coiled tubing, an injector, control console, power supply and well-control stack. The coiled tubing is injected into the existing production string, unwound from the reel, and inserted into the well. The advantage of coiled tubing over conventional straight tubing Is the fact that coiled tubing does not have to be screwed together, and does not require a workover rig. Because coiled tubing is inserted into the well while production is ongoing, it is also a cost-effective choice and can be used on high-pressure wells. Specs: Length: 53' Width: 8' 5" Height: 13' 6" Cabin features: Custom built cabin manufactured with top of the line materials Custom paint and full vinyl wrap Low profile LEDs and textured floors Fully customized console controls Reel features: Trailer mounted Built-in tubing reel brake safety Tubing data acquisition control system & software Two-part drive gear to increase serviceability without reel removal ...
Location: Houston, TX Date Posted: Thursday, June 14, 2018
Condition: Used Price:
view details
For Sale: Coil Tubing Unit, 2010, Trailer (only) mounted
2010 Trailer Mounted, Coiled Tubing Unit, Trailer only, Stewart Stevenson built package, Control Cabin, 680 Injector, Hydraulic hoses, 1.5-inch x 19,600-ft (approx) QT800 tubing (never used), 1.5-inch injector fitting. Other options include HPU, Wetkit, not tractor mounted. ...
Location: Houston Date Posted: Thursday, May 10, 2018
Condition: Used Price: Call for Details
view details
For Sale: Unit OF-124: 2008 Stewart & Stevenson trailer-mounted high-capacity 2-inch coiled tubing unit
TRAILER MOUNTED HIGH CAPACITY COILED TUBING UNIT MODEL TT-100-HC 1.0 DEION This specification covers the requirements of design, fabrication and testing of a Trailer Mounted Coiled Tubing Unit suitable for onshore use. 2.0 SCOPE OF SUPPLY Stewart & Stevenson is responsible for the supply of a Trailer Mounted Coiled Tubing Unit including the following: - One (1) Drop-through style Reel Trailer with Injector Tilt Mount - One (1) Wet kit power pack - One (1) Control cabin - One (1) Tubing reel assembly - One (1) Injector Head assembly - One (1) Hose reel and hose assembly - One (1) Unitization and completion NOTE: THIS UNIT SHALL BE DRESSED FOR 1.75” TUBING HIGH CAPACITY TRAILER PACKAGE – DROP THROUGH REEL 1.0 TRAILER ASSEMBLY The Trailer Assembly will be a heavy-duty drop deck trailer with the following features: - High strength T-1 steel beam trailer - 18” Minimum ground clearance (not including drip pan) - 13’6” Maximum height - 45’ Maximum length - Removable drip pan installed underneath reel - Holland Mark V landing legs - Axles (3 each) 25,000 lb. capacity each oil bath. Axles to have dual disc, ten (10) hole bud, and polished aluminum wheels. - Air brake system - Grated deck flooring - 2 in. SAE king pin with 3/8 rub plate - Lights, stop/turn armored clearance - Mud flaps - Rear bumper - Running lights for highway use - Fold down walkway - driver’s side cabin with ladder and handrails - 4 ft wide fold up platform with ladder and handrails to access passenger side cabin door - Two (2) 5 ft wide fold down work platforms on either side of the work reel mounted inside the trailer flange - Reflective Tape - Ladder rack - Mounting brackets for all components including reel assembly, control cabin assembly, etc. 2.0 REEL ASSEMBLY Installed on this unit will be a Reel Unit Package. This package will be a drop through type reel. Basic specifications of the unit are as listed below: Core - 80” Flange - 144” Width - 69” Approximate Tubing Capacities: 1-3/4” - 21,000 ft. Other drum sizes are available. 2.1 REEL MOUNTING SYSTEM The Reel Mounting System on this unit is designed to accommodate the Stewart & Stevenson core quick change out system. This system will allow one (1) trailer unit (drive motor, levelwind, bearing, swivel, etc.) to be used with several different reel cores (drums) to accommodate different types of jobs without unnecessary spooling of tubing on and off of the unit. This type of system saves tubing life and provides tremendous time savings. Included in the reel mounting system are the following: - Two (2) heavy-duty steel support frames will be welded to the outside frame rails to support the reel core. Each support frame shall include a bearing box receiver to accept the S&S machined steel roller bearings mounted on the reel shaft. - The S&S main reel bearings are steel roller bearings designed for smooth operation and precise control. Each bearing is rated for 300,000lbs. static load making them ideal for high-capacity tubing weights. They are housed in a heavy-duty machined steel housing with special dust seals to prevent contaminants from corrupting the bearings. The housing contains two (2) heavy-duty pin holes to pin the reel in place on the trailer support frame. - The reel will be driven from a radial piston hydraulic motor with an integral planetary type reduction gearbox via a chain and sprocket drive system. The motor/gearbox shall be mounted to the trailer via a hinged mounting plate. This plate is hinged to the trailer on one (1) side and secured via wing nuts on the opposite side. The wing nuts can be loosened and the motor hinged forward to facilitate removal of the drive chain during reel core change out. In this way, the drive chain master links do not have to be removed and reset. - A levelwind mechanism will be installed on the reel assembly. This mechanism will incorporate a diamond lead screw that will be driven in synchronization with the drum speed and rotation by a chain and sprocket and friction clutch arrangement powered from the reel main drive shaft. A back-up hydraulic motor for spooler override purposes will be connected to the diamond lead screw. - The levelwind assembly will by hydraulically raised or lowered to suit pay-off angle by two (2) hydraulic cylinders. The over center valve is installed in circuit to prevent levelwind assembly from collapsing in case of a hydraulic failure. - A mechanical depthometer assembly with a five (5) digit resetable type readout will be installed on the vertical slide section of the levelwind mechanism (reading depth in feet). - A stuffing box will be installed for pipe lubrication on the depthometer assembly. - External plumbing arrangement will consist of an inlet manifold with 15,000 psi chicksan with Fig. 1502 unions to connect to a Fig. 1502 tee connection on which will be mounted two (2), 2” x 15,000 psi plug valves with 2” Fig. 1502 connections. Tee and plug valve assembly will be secured to the trailer frame assembly by clamps. A gauge connection with 4:1 pressure debooster should be installed. Circulating pressure debooster is to be mounted on external plumbing. All piping is to be 15,000 psi WP sweet service. A high pressure turbine flowmeter will be installed between the two plug valves. The flowmeter will be wired to the control cabin for displaying circulating flow rate. - Where required, quick release guards will be installed over all exposed drive systems. - Installed on the trailer will be a lubrication fluid/inhibitor reservoir complete with pressure gauge, air inlet, discharge metering valve, relief valve, and all necessary hosing. - A ladder will be provided to access the top of the reel and the counter. 2.2 REEL CORE ASSEMBLY Installed on this unit shall be one (1) reel core assembly. This reel core shall have the following specifications. - The outer and inner circumference of the actual reel and the spokes shall be constructed from structural steel. Exposed areas between each spoke shall be covered with expanded metal. - Reel shaft will be constructed from a 10” heavy-duty steel shaft and will be adaptable for electric wireline installation. This shaft shall be non-pressurized. - A 1-3/4” bore circulating swivel will be installed inside the shaft and rated at 15,000 psi WP sweet service. This swivel is a quick stab swivel and is secured in the reel shaft by a single lock down bolt. - The reel assembly will be supplied with a chain and boomer transport locking system. - Reel internal plumbing arrangement will include a tubing connection from the quick stab swivel to an internal 2” plug valve via a 2” X Fig. 1502 wing half connection rated at 15,000 psi WP. From the 2” plug valve, 2” tee connects to the coiled tubing through a 90° elbow on one (1) side and provides for ball and pig insertion on the opposite side. Ball and pig inlet is blanked off with a blanking Fig. 1502 union half. All piping shall be 15,000 psi WP rated for sweet service. 3.0 EQUIPMENT MOUNTS Complete equipment mounts will be installed on the trailer in such a manner to allow quick rig-up. A 45° Injector mount will be installed at the rear of the trailer. The laydown rack will be hydraulically raised and lowered. 4.0 HOSES Permanently installed hoses are provided from the control cabin bulkhead for connection to the following: - Injector main drive hoses - power pack to rear of trailer - BOP control hoses will be permanently installed in the trailer - Injector control hoses will be permanently installed in the trailer - Reel control jumper hoses WET KIT STYLE - POWER PACK 1.0 DEION Supplied with this unit for installation by S&S on a suitable tractor with fifth wheel attachment will be a wet kit style hydraulic power unit. This unit is designed to transfer power from the tractor engine to the CTU hydraulic system. This wet kit power pack will be supplied on a single-square tube-frame assembly, which is pinned on the rear of the tractor. Power is transferred via a power splitter box and drive shaft to a two (2) place pump drive assembly. Details of this system are as follows: 2.0 HYDRAULIC SYSTEM A. MAIN HYDRAULIC SYSTEM The injector is powered by a bi-directional, axial piston, pressure compensated, closed loop hydraulic pump system mounted on the output of the hydraulic drive gearbox. The injector brake control will be powered by primary drive pressure of this hydraulic pump system. B. AUXILIARY HYDRAULIC SYSTEM A tandem axial piston, pressure compensated hydraulic pump mounted on the second outlet of the hydraulic drive will provide for the following: - Levelwind override hydraulic motor - Levelwind lift control hydraulic cylinders - Primary reel drive - Hose reel hydraulic motors - Control cabin lift cylinders - Auxiliary outlet for an auxiliary spooling reel - BOP rams - Stripper/packer - Injector chain traction system - Injector chain tension Note: The above hydraulic systems will be controlled by proportional control valves with built in directional and flow control functions and inlet relief valves. C. HAND PUMP SYSTEM Installed in the control cabin will be a high-pressure hand pump to provide back up power to the following: - BOP rams - Stripper/packer - Injector chain traction system D. ACCUMULATOR SYSTEM Four (4) high-pressure accumulator bottles with a minimum volume of ten (10) US gallons per bottle will be supplied and installed to provide a constant back up hydraulic pressure to the hand pump system. This accumulator system will be charged to 1500 psig from the above-described main hydraulic system and will be installed on the wet kit power pack. E. HYDRAULIC OIL FILTRATION All hydraulic oil circuits will include suction line filters with 100 mesh elements to remove particles. Elements will be removable for inspection and cleaning. Filtration of returning oil flows from injector and reel circuits immediately prior to entering main hydraulic tank will be carried out with the required filter assemblies. Filter size will not be less than 10 micron and will be spin on type. High-pressure filters will be installed to protect injector motors and pump. All filters will be fitted with a self- activating bypass valve and an indicator to show relative state of fouling of element. Also supplied will be the other main components for a hydraulic system: - A hydraulic oil reservoir with sight level gauge, filter breather cap, and return filters. - A hydraulic oil cooler - All necessary hydraulic valves, gauges, hoses, and piping - A quick disconnect panel connected to the above system with outlets for extended connections to the tubing reel and the control cabin and hose reel assemblies. 3.0 TRUCK INSTALLATION KIT Supplied with this unit will be the following items for installation of this wet kit on the tractor assembly. - Cushman Power splitter box assembly with pneumatic engage/disengage - Drive shaft from splitter box to pump drive - Anti-vibration mounts - Driveline Modifications 4.0 GENERATOR 5.0 Mounted with the wet kit shall be an Onan CMQD 5000, 5kw generator (or equivalent). This generator shall be used to provide electrical power to the unit at the wellsite. CONTROL CABIN 1.0 DEION The unit will be fully operational from this new enhanced control cabin via mechanical, hydraulic, and pneumatic controls. The only exceptions to this will be the cabin lift system and the power hose reel controls, which are operated from locally sited controls. The new enhanced control cabin will be approximately 7’ wide x 10’ deep x 6’-6” high. It will be lined and fully insulated. The cabin will have two (2) side locking doors with windows and a large front window and with attack proof glass. The front window will be equipped with a windshield wiper and sun visor. Supplied and installed for access to the side doors of this cabin will be access ladders with grab handles. Standard equipment in the control cabin will be: - Stainless steel hardware - Internal LED and puck type lighting system - Rolling Captain’s chair behind control console - Heavy-duty rubber insulated floor covering, fire resistant. - Two (2) stadium style seats at rear of cabin - Air horn - Bard electric A/C and heater system - Two (2) work lights (adjustable from cab) - All hydraulic connections to and from the control cabin will be via a hydraulic bulkhead. - Stewart & Stevenson installs an air driven pump in the cabin that can be used to deliver 5,000 psi to the stripper in case of emergency. This pump shall also have a handle instead and be used as a second manual back-up pump. - A full control console will be installed in this cabin. This console will be of stainless steel construction and be fully labeled with all gauge and control information. The panel will be mounted on an engineered fabricated housing that incorporates the back-up pump, hydraulic valves, interface, etc. - The following controls and gauges will be installed in this control console. ° Engine tachometer ° Engine throttle ° System air pressure gauge - fluid filled ° Engine stop button ° Engine emergency kill (if equipped) ° Oil pressure gauge ° Water temperature gauge ° Fuel level gauge ° Hydraulic oil level gauge - Injector controls: ° In/out control valve (direction) ° Speed control ° Variable speed control ° Chain/gripper control valves with individual pressure gauge ° Chain tension control valve with individual pressure indication ° Chain tension control ° Injector drive pressure gauge - fluid filled - Auxiliary system hydraulic pressure gauge - fluid filled - BOP ram/auxiliary control valves – quantity of six (6) - BOP safety control valve - Hose numbers corresponding to each BOP control function will be labeled in panel - Stripper packer hydraulic control valve and pressure gauge – quantity of two (2) - Stripper window control - Well head pressure gauge - Circulation pressure gauge - Tubing weight indicator - Tubing reel tension (speed) control valve - Tubing reel direction control - Reel pressure gauge - fluid filled - Inhibitor control - Light switch - Plus other miscellaneous gauges and controls for full operation of the unit - Installed at side of control panel will be two (2) hydraulic hand pumps with auxiliary hydraulic reservoirs - Installed in the cabin will be a separate hydraulic circuit for the injector load cell indicator - External 110VAC outlet - Sensor bulkhead - Fold down desk near operators console - AM/FM/CD Stereo system w/ speakers - A chart recorder will NOT be included SERIES M-100L INJECTOR HEAD 1.0 DEION This new unique Stewart & Stevenson M-100L (Long) Series Injector Head has the following patented features and general specifications: 2.0 EQUIPMENT Model No. : Series M-100L Length : 52” Width : 52” Height : 96” Weight : 8,500 Lbs. (excluding 90” Gooseneck) Pull Force High (working) : 100,000 Lbs. Snub Force : 40,000 Lbs. Max Speed : up to 200 ft/min. Speed @ 30,000 lbs Pull : up to 190 ft/min (+/-5%) Chain Type : Varia-Block III Heavy Gooseneck (Flared) : Two (2) Piece, 90” Hydraulic Folding Motors : Two (2) Axial piston, variable displacement 3.0 TOP DRIVE/BRAKE SYSTEM The top drive/static brake assembly consists of two (2) variable displacement, axial piston hydraulic motors, double reduction planetary gear reducers, and spring applied, pressure released, multi-disc brakes. These assemblies are flange mounted to the injector body and drive the carburized drive sprockets and timing gears. The drive motors are protected by high-pressure filters with reverse flow check valves. Each filter will have a 10 micron, stainless steel, and cleanable element. Hydraulic load holding counterbalance valves are installed at the motor ports to hold the tubing load (in and out hole) when the brakes are released. 4.0 DRIVE CHAIN DEION Steel plate body construction with full access side openings to enable easy removal of the drive chain and tubing blocks. The drive chains and injector blocks may be fitted for tubing sizes of 1” OD through 2- 7/8” when fitted with the Varia-Block III chains. The traction chains are designed to transmit a force of not less than 100,000 Lbs. in the out-hole and 40,000 Lbs. in the in-hole directions from a stalled position. Slippage of the tubing relative to the gripper blocks will not occur at pulling force of 100,000 Lbs. with the surface of the tubing and blocks in a diesel wet condition. The force exerted by the chains on the tubing will not mark the surface of the tubing. The two (2) drive chains are of the roller chain type with connecting links to allow for replacement of the drive chains and injector blocks while the tubing remains in the injector. Separate connecting shafts connect the tubing blocks to each of the drive chains instead of the more common single through shaft, which causes adverse stressing of the tubing blocks in the case of misalignment of the drive chains and coiled tubing. Clearance between the tubing blocks when fully retracted allows for the passage of the various tools that are normally used in coiled tubing strings. The feature also allows easier tubing stab-in into the injector. The tubing blocks are the new Varia-Block III design. The new design incorporates a longer contact area per block to maintain contact with two (2) roller bearings at all times, and as many as three (3). The new design reduces wear, prolongs life, and should significantly reduce overall maintenance costs of the injector head and some of its parts 5.0 CHAIN TRACTION SYSTEM Chain traction is achieved by the use of a single skate/roller bearing assembly that applies pressure to the backsides of both drive chains. These roller assemblies are each compressed by single hydraulic cylinders. The 10 (10) hydraulic cylinders are plumbed in two (2) sets of five (5) hydraulic cylinders. If a failure in the hydraulic cylinders or tubing occurs, one (1) set can be isolated from the other and traction maintained on the tubing. Each hydraulic circuit incorporates an accumulator to prevent variations in tubing diameter to vary the hydraulic pressure. Each control circuit is protected by a velocity fuse to prevent loss of control due to hose failure. The two (2) sets of five (5) hydraulic cylinders have one (1) pressure control at the panel since the 10 (10) hydraulic cylinders operate at the same hydraulic pressure. This tubing traction system drastically reduces the tubing damage that is normally associated with excessive roller skate assembly hydraulic pressure. The roller skate assemblies use large 2-3/8” diameter roller bearings. The use of these large roller bearings with the new chain and block design ensures that two (2) rollers are in contact with each tubing block prior to transition from one (1) bock to the next at all times. This feature prevents pivoting and clattering of the tubing blocks as they pass over the drive chain sprockets and reduces the stress on the tubing caused by the gripping of the tubing blocks on the tubing. The tubing roller bearings are equipped with full lip seals for greater grease capacity and sealing capability and use large rollers with increased load ratings. 6.0 CHAIN TENSIONING SYSTEM Chain tensioning is achieved by a direct vertical movement of the bottom drive chain idler sprockets by two (2) pairs of hydraulic cylinders powered by a single hydraulic circuit with back-up accumulator for ease of operation. This feature gives a greater range of drive chain tensioning without reducing the drive chain contact on the drive chain drive and idler sprockets and thus increases the life of the drive chains. 7.0 TUBING GUIDE GOOSENECK The Heavy-Duty Tubing Guide Gooseneck is a 90” radius with steel roller straightener lower section and steel rollers on upper section. All bearings with grease zerts. Gooseneck will fold downward for storage by means of a hydraulic cylinder. The cylinder will also act as the stiffener for the tail section of the gooseneck. Heavy-duty pins and hinges on gooseneck. 8.0 GENERAL The injector pivots on one (1) side of the injector frame base, a load cell sensor is installed on the other side of the injector. The pivot bearings are lubricated. The injector is installed in an outer lift frame with steel base, guards, and a four (4) point lifting system, access ladders, and decking of the top of the protection frame. The injector is equipped with a bottom flange connection and adapter for use with a customer furnished 3.06 15M TOT Over/Under stripper/packer assembly. Compression cylinder piping is done in all stainless steel tubing to lesson the likelihood of a control line rupture on location. Velocity fuses are provided in the control circuit lines to prevent loss of control in the event of line failure. Fuse reset valves are provided for each circuit. All hydraulic connections on the injector are piped to a quick disconnect coupling panel, using bulkhead fittings installed at the bottom front side of the injector. All hoses will be supported by chain and hook arrangement so that hose connections do not carry a heavy load. Drain in bottom of drain pan, 1-1/2 NPT. Dual Hydraulic/Electronic load cell attachments Safety belt hooks at top of injector, recessed below plate. Chain attachment padeyes on top four (4) corners of frame, directed inward. Automatic brake release with injector motor pressure. • INCLUDED ITEMS • Gooseneck hair pin/guide post rollers • Fold-down work boards w/ handrails • Tubing odometer • Encoder mounted on brake • Grease manifold upper and lower • Heavy Duty Slings, shackles, and D-ring • 4:1 debooster for measuring wellhead pressure • Hydraulic and Electronic load cells • Fall protector pole HOSE REELS AND HOSES 1.0 DEION Installed on the trailer package will be the following hose reel and hose assemblies: 2.0 TUBING INJECTOR POWER HOSE REEL This will be a two (2) section hose reel hydraulically powered through a chain drive speed reducing arrangement with locally operated direction and speed control valve. This reel will be supplied with bearing and shaft retainers and incorporates a mechanical lock to hold the reel when not in use. This reel is used to hold the two (2) injector power hoses and is equipped with high pressure hydraulic hose swivels and Snaptite (or equivalent) type quick disconnect couplings. 2.1 HOSES Supplied with each unit will be the following hose assemblies: Installed on the Tubing Injector Drive Hose Reel will be the following hoses: - One (1) set of 1-1/2” x 125-ft. long injector drive hoses with quick coupler assemblies 3.0 CONTROL HOSES – FIGURE 8 HOSE RACKS BOP, injector and stripper control hoses will be installed on two (2) figure 8 hose racks mounted at the rear of the trailer: - One (1) only set of 125 ft. long injector control hoses complete with quick coupler assemblies. This bundle will include the injector load cell hose. An electrical cable to connect the electronic load cell will also be part of this bundle. - Two (2) only sets of 125 ft. long stripper packer control hoses complete with quick coupler assemblies bundled with injector control hoses. - Six (6) only sets of 125-ft. long BOP actuator hoses, one (1) for each BOP ram assembly (i.e., pipe ram, slip ram, shear ram, blind ram, and two auxiliaries) complete with quick coupler assemblies. This bundle will include the wellhead pressure signal hose. - Control hoses will be covered with Cordura (or equivalent) protection covering. UNITIZATION & COMPLETION 1.0 DEION Supplied with the unit will be the following standard equipment. (Note: This equipment will be part of above unit, and if already mentioned, an item will not be duplicated.) - Decking on the unit (where required) - Installation of observation lights for 24-hour use - Installation of all other electrical systems - Installation of all pneumatic systems - Installation of all hydraulic systems - All steel and misc. fittings to complete the unit - All labor to complete the unit - Fire extinguisher - General workmanship will be of good quality and appearance. - Snaptite 72 Series quick disconnects are to be used. Unitization and completion shall include but not be limited to the following: - Flame cut edges shall be ground smooth. - Sharp corners and edges to which operators and mechanics are vulnerable shall be ground smooth. - Bolt holes for bolts shall be drilled (not torch cut) no mote than 1/8” larger than the bolt it accepts. - Welds are of good quality and sufficient strength. - Use self-locking nuts where applicable. - No sweated or brazed type hydraulic fittings will be used. - All hoses and connections will be within protective frame and be well secured rubber sleeves to prevent rubbing by frame, etc. - Hydraulic reservoir to be constructed of steel plate with sight level gauge, cleanouts, vent, fill cap, etc. The priming and painting of the equipment to be the customer’s color per Stewart & Stevenson’s standard paint specification, ES-502, latest revision - Complete testing of equipment at Stewart & Stevenson plant in Houston, Texas, USA. Two (2) copies of all relevant test and quality control certificates of the manufacture and testing of all unit functions and parameters will be supplied together with two (2) copies of all required vendor and manufacture test certificates in the English language. - The unit will also be taken to a local test well to test the functionality under normal loads. S&S will provide two technicians for the testing. Testing will be complete when the unit has met contract specifications. Pipe for the test well test will be provided by S&S. TRUCK 2008 KENWORTH T800 4 axle 20K front 20K Drop Axle 24K rear axles CAT C15 550hp RTLO 18918B Dana D52-190P 4.56 ratio P/S, A/C – AM/FM radio CB Radio Hydraulic power pack Kubota generator...
Location: Houston, TX Date Posted: Thursday, April 05, 2018
Condition: Used Price:
view details
For Sale: Unit OF-125: 2008 Stewart & Stevenson trailer-mounted high-capacity 2-inch coiled tubing unit
TRAILER MOUNTED HIGH CAPACITY COILED TUBING UNIT MODEL TT-100-HC 1.0 DEION This specification covers the requirements of design, fabrication and testing of a Trailer Mounted Coiled Tubing Unit suitable for onshore use. 2.0 SCOPE OF SUPPLY Stewart & Stevenson is responsible for the supply of a Trailer Mounted Coiled Tubing Unit including the following: - One (1) Drop-through style Reel Trailer with Injector Tilt Mount - One (1) Wet kit power pack - One (1) Control cabin - One (1) Tubing reel assembly - One (1) Injector Head assembly - One (1) Hose reel and hose assembly - One (1) Unitization and completion NOTE: THIS UNIT SHALL BE DRESSED FOR 1.75” TUBING HIGH CAPACITY TRAILER PACKAGE – DROP THROUGH REEL 1.0 TRAILER ASSEMBLY The Trailer Assembly will be a heavy-duty drop deck trailer with the following features: - High strength T-1 steel beam trailer - 18” Minimum ground clearance (not including drip pan) - 13’6” Maximum height - 45’ Maximum length - Removable drip pan installed underneath reel - Holland Mark V landing legs - Axles (3 each) 25,000 lb. capacity each oil bath. Axles to have dual disc, ten (10) hole bud, and polished aluminum wheels. - Air brake system - Grated deck flooring - 2 in. SAE king pin with 3/8 rub plate - Lights, stop/turn armored clearance - Mud flaps - Rear bumper - Running lights for highway use - Fold down walkway - driver’s side cabin with ladder and handrails - 4 ft wide fold up platform with ladder and handrails to access passenger side cabin door - Two (2) 5 ft wide fold down work platforms on either side of the work reel mounted inside the trailer flange - Reflective Tape - Ladder rack - Mounting brackets for all components including reel assembly, control cabin assembly, etc. 2.0 REEL ASSEMBLY Installed on this unit will be a Reel Unit Package. This package will be a drop through type reel. Basic specifications of the unit are as listed below: Core - 80” Flange - 144” Width - 69” Approximate Tubing Capacities: 1-3/4” - 21,000 ft. Other drum sizes are available. 2.1 REEL MOUNTING SYSTEM The Reel Mounting System on this unit is designed to accommodate the Stewart & Stevenson core quick change out system. This system will allow one (1) trailer unit (drive motor, levelwind, bearing, swivel, etc.) to be used with several different reel cores (drums) to accommodate different types of jobs without unnecessary spooling of tubing on and off of the unit. This type of system saves tubing life and provides tremendous time savings. Included in the reel mounting system are the following: - Two (2) heavy-duty steel support frames will be welded to the outside frame rails to support the reel core. Each support frame shall include a bearing box receiver to accept the S&S machined steel roller bearings mounted on the reel shaft. - The S&S main reel bearings are steel roller bearings designed for smooth operation and precise control. Each bearing is rated for 300,000lbs. static load making them ideal for high-capacity tubing weights. They are housed in a heavy-duty machined steel housing with special dust seals to prevent contaminants from corrupting the bearings. The housing contains two (2) heavy-duty pin holes to pin the reel in place on the trailer support frame. - The reel will be driven from a radial piston hydraulic motor with an integral planetary type reduction gearbox via a chain and sprocket drive system. The motor/gearbox shall be mounted to the trailer via a hinged mounting plate. This plate is hinged to the trailer on one (1) side and secured via wing nuts on the opposite side. The wing nuts can be loosened and the motor hinged forward to facilitate removal of the drive chain during reel core change out. In this way, the drive chain master links do not have to be removed and reset. - A levelwind mechanism will be installed on the reel assembly. This mechanism will incorporate a diamond lead screw that will be driven in synchronization with the drum speed and rotation by a chain and sprocket and friction clutch arrangement powered from the reel main drive shaft. A back-up hydraulic motor for spooler override purposes will be connected to the diamond lead screw. - The levelwind assembly will by hydraulically raised or lowered to suit pay-off angle by two (2) hydraulic cylinders. The over center valve is installed in circuit to prevent levelwind assembly from collapsing in case of a hydraulic failure. - A mechanical depthometer assembly with a five (5) digit resetable type readout will be installed on the vertical slide section of the levelwind mechanism (reading depth in feet). - A stuffing box will be installed for pipe lubrication on the depthometer assembly. - External plumbing arrangement will consist of an inlet manifold with 15,000 psi chicksan with Fig. 1502 unions to connect to a Fig. 1502 tee connection on which will be mounted two (2), 2” x 15,000 psi plug valves with 2” Fig. 1502 connections. Tee and plug valve assembly will be secured to the trailer frame assembly by clamps. A gauge connection with 4:1 pressure debooster should be installed. Circulating pressure debooster is to be mounted on external plumbing. All piping is to be 15,000 psi WP sweet service. A high pressure turbine flowmeter will be installed between the two plug valves. The flowmeter will be wired to the control cabin for displaying circulating flow rate. - Where required, quick release guards will be installed over all exposed drive systems. - Installed on the trailer will be a lubrication fluid/inhibitor reservoir complete with pressure gauge, air inlet, discharge metering valve, relief valve, and all necessary hosing. - A ladder will be provided to access the top of the reel and the counter. 2.2 REEL CORE ASSEMBLY Installed on this unit shall be one (1) reel core assembly. This reel core shall have the following specifications. - The outer and inner circumference of the actual reel and the spokes shall be constructed from structural steel. Exposed areas between each spoke shall be covered with expanded metal. - Reel shaft will be constructed from a 10” heavy-duty steel shaft and will be adaptable for electric wireline installation. This shaft shall be non-pressurized. - A 1-3/4” bore circulating swivel will be installed inside the shaft and rated at 15,000 psi WP sweet service. This swivel is a quick stab swivel and is secured in the reel shaft by a single lock down bolt. - The reel assembly will be supplied with a chain and boomer transport locking system. - Reel internal plumbing arrangement will include a tubing connection from the quick stab swivel to an internal 2” plug valve via a 2” X Fig. 1502 wing half connection rated at 15,000 psi WP. From the 2” plug valve, 2” tee connects to the coiled tubing through a 90° elbow on one (1) side and provides for ball and pig insertion on the opposite side. Ball and pig inlet is blanked off with a blanking Fig. 1502 union half. All piping shall be 15,000 psi WP rated for sweet service. 3.0 EQUIPMENT MOUNTS Complete equipment mounts will be installed on the trailer in such a manner to allow quick rig-up. A 45° Injector mount will be installed at the rear of the trailer. The laydown rack will be hydraulically raised and lowered. 4.0 HOSES Permanently installed hoses are provided from the control cabin bulkhead for connection to the following: - Injector main drive hoses - power pack to rear of trailer - BOP control hoses will be permanently installed in the trailer - Injector control hoses will be permanently installed in the trailer - Reel control jumper hoses WET KIT STYLE - POWER PACK 1.0 DEION Supplied with this unit for installation by S&S on a suitable tractor with fifth wheel attachment will be a wet kit style hydraulic power unit. This unit is designed to transfer power from the tractor engine to the CTU hydraulic system. This wet kit power pack will be supplied on a single-square tube-frame assembly, which is pinned on the rear of the tractor. Power is transferred via a power splitter box and drive shaft to a two (2) place pump drive assembly. Details of this system are as follows: 2.0 HYDRAULIC SYSTEM A. MAIN HYDRAULIC SYSTEM The injector is powered by a bi-directional, axial piston, pressure compensated, closed loop hydraulic pump system mounted on the output of the hydraulic drive gearbox. The injector brake control will be powered by primary drive pressure of this hydraulic pump system. B. AUXILIARY HYDRAULIC SYSTEM A tandem axial piston, pressure compensated hydraulic pump mounted on the second outlet of the hydraulic drive will provide for the following: - Levelwind override hydraulic motor - Levelwind lift control hydraulic cylinders - Primary reel drive - Hose reel hydraulic motors - Control cabin lift cylinders - Auxiliary outlet for an auxiliary spooling reel - BOP rams - Stripper/packer - Injector chain traction system - Injector chain tension Note: The above hydraulic systems will be controlled by proportional control valves with built in directional and flow control functions and inlet relief valves. C. HAND PUMP SYSTEM Installed in the control cabin will be a high-pressure hand pump to provide back up power to the following: - BOP rams - Stripper/packer - Injector chain traction system D. ACCUMULATOR SYSTEM Four (4) high-pressure accumulator bottles with a minimum volume of ten (10) US gallons per bottle will be supplied and installed to provide a constant back up hydraulic pressure to the hand pump system. This accumulator system will be charged to 1500 psig from the above-described main hydraulic system and will be installed on the wet kit power pack. E. HYDRAULIC OIL FILTRATION All hydraulic oil circuits will include suction line filters with 100 mesh elements to remove particles. Elements will be removable for inspection and cleaning. Filtration of returning oil flows from injector and reel circuits immediately prior to entering main hydraulic tank will be carried out with the required filter assemblies. Filter size will not be less than 10 micron and will be spin on type. High-pressure filters will be installed to protect injector motors and pump. All filters will be fitted with a self- activating bypass valve and an indicator to show relative state of fouling of element. Also supplied will be the other main components for a hydraulic system: - A hydraulic oil reservoir with sight level gauge, filter breather cap, and return filters. - A hydraulic oil cooler - All necessary hydraulic valves, gauges, hoses, and piping - A quick disconnect panel connected to the above system with outlets for extended connections to the tubing reel and the control cabin and hose reel assemblies. 3.0 TRUCK INSTALLATION KIT Supplied with this unit will be the following items for installation of this wet kit on the tractor assembly. - Cushman Power splitter box assembly with pneumatic engage/disengage - Drive shaft from splitter box to pump drive - Anti-vibration mounts - Driveline Modifications 4.0 GENERATOR 5.0 Mounted with the wet kit shall be an Onan CMQD 5000, 5kw generator (or equivalent). This generator shall be used to provide electrical power to the unit at the wellsite. CONTROL CABIN 1.0 DEION The unit will be fully operational from this new enhanced control cabin via mechanical, hydraulic, and pneumatic controls. The only exceptions to this will be the cabin lift system and the power hose reel controls, which are operated from locally sited controls. The new enhanced control cabin will be approximately 7’ wide x 10’ deep x 6’-6” high. It will be lined and fully insulated. The cabin will have two (2) side locking doors with windows and a large front window and with attack proof glass. The front window will be equipped with a windshield wiper and sun visor. Supplied and installed for access to the side doors of this cabin will be access ladders with grab handles. Standard equipment in the control cabin will be: - Stainless steel hardware - Internal LED and puck type lighting system - Rolling Captain’s chair behind control console - Heavy-duty rubber insulated floor covering, fire resistant. - Two (2) stadium style seats at rear of cabin - Air horn - Bard electric A/C and heater system - Two (2) work lights (adjustable from cab) - All hydraulic connections to and from the control cabin will be via a hydraulic bulkhead. - Stewart & Stevenson installs an air driven pump in the cabin that can be used to deliver 5,000 psi to the stripper in case of emergency. This pump shall also have a handle instead and be used as a second manual back-up pump. - A full control console will be installed in this cabin. This console will be of stainless steel construction and be fully labeled with all gauge and control information. The panel will be mounted on an engineered fabricated housing that incorporates the back-up pump, hydraulic valves, interface, etc. - The following controls and gauges will be installed in this control console. ° Engine tachometer ° Engine throttle ° System air pressure gauge - fluid filled ° Engine stop button ° Engine emergency kill (if equipped) ° Oil pressure gauge ° Water temperature gauge ° Fuel level gauge ° Hydraulic oil level gauge - Injector controls: ° In/out control valve (direction) ° Speed control ° Variable speed control ° Chain/gripper control valves with individual pressure gauge ° Chain tension control valve with individual pressure indication ° Chain tension control ° Injector drive pressure gauge - fluid filled - Auxiliary system hydraulic pressure gauge - fluid filled - BOP ram/auxiliary control valves – quantity of six (6) - BOP safety control valve - Hose numbers corresponding to each BOP control function will be labeled in panel - Stripper packer hydraulic control valve and pressure gauge – quantity of two (2) - Stripper window control - Well head pressure gauge - Circulation pressure gauge - Tubing weight indicator - Tubing reel tension (speed) control valve - Tubing reel direction control - Reel pressure gauge - fluid filled - Inhibitor control - Light switch - Plus other miscellaneous gauges and controls for full operation of the unit - Installed at side of control panel will be two (2) hydraulic hand pumps with auxiliary hydraulic reservoirs - Installed in the cabin will be a separate hydraulic circuit for the injector load cell indicator - External 110VAC outlet - Sensor bulkhead - Fold down desk near operators console - AM/FM/CD Stereo system w/ speakers - A chart recorder will NOT be included SERIES M-100L INJECTOR HEAD 1.0 DEION This new unique Stewart & Stevenson M-100L (Long) Series Injector Head has the following patented features and general specifications: 2.0 EQUIPMENT Model No. : Series M-100L Length : 52” Width : 52” Height : 96” Weight : 8,500 Lbs. (excluding 90” Gooseneck) Pull Force High (working) : 100,000 Lbs. Snub Force : 40,000 Lbs. Max Speed : up to 200 ft/min. Speed @ 30,000 lbs Pull : up to 190 ft/min (+/-5%) Chain Type : Varia-Block III Heavy Gooseneck (Flared) : Two (2) Piece, 90” Hydraulic Folding Motors : Two (2) Axial piston, variable displacement 3.0 TOP DRIVE/BRAKE SYSTEM The top drive/static brake assembly consists of two (2) variable displacement, axial piston hydraulic motors, double reduction planetary gear reducers, and spring applied, pressure released, multi-disc brakes. These assemblies are flange mounted to the injector body and drive the carburized drive sprockets and timing gears. The drive motors are protected by high-pressure filters with reverse flow check valves. Each filter will have a 10 micron, stainless steel, and cleanable element. Hydraulic load holding counterbalance valves are installed at the motor ports to hold the tubing load (in and out hole) when the brakes are released. 4.0 DRIVE CHAIN DEION Steel plate body construction with full access side openings to enable easy removal of the drive chain and tubing blocks. The drive chains and injector blocks may be fitted for tubing sizes of 1” OD through 2- 7/8” when fitted with the Varia-Block III chains. The traction chains are designed to transmit a force of not less than 100,000 Lbs. in the out-hole and 40,000 Lbs. in the in-hole directions from a stalled position. Slippage of the tubing relative to the gripper blocks will not occur at pulling force of 100,000 Lbs. with the surface of the tubing and blocks in a diesel wet condition. The force exerted by the chains on the tubing will not mark the surface of the tubing. The two (2) drive chains are of the roller chain type with connecting links to allow for replacement of the drive chains and injector blocks while the tubing remains in the injector. Separate connecting shafts connect the tubing blocks to each of the drive chains instead of the more common single through shaft, which causes adverse stressing of the tubing blocks in the case of misalignment of the drive chains and coiled tubing. Clearance between the tubing blocks when fully retracted allows for the passage of the various tools that are normally used in coiled tubing strings. The feature also allows easier tubing stab-in into the injector. The tubing blocks are the new Varia-Block III design. The new design incorporates a longer contact area per block to maintain contact with two (2) roller bearings at all times, and as many as three (3). The new design reduces wear, prolongs life, and should significantly reduce overall maintenance costs of the injector head and some of its parts 5.0 CHAIN TRACTION SYSTEM Chain traction is achieved by the use of a single skate/roller bearing assembly that applies pressure to the backsides of both drive chains. These roller assemblies are each compressed by single hydraulic cylinders. The 10 (10) hydraulic cylinders are plumbed in two (2) sets of five (5) hydraulic cylinders. If a failure in the hydraulic cylinders or tubing occurs, one (1) set can be isolated from the other and traction maintained on the tubing. Each hydraulic circuit incorporates an accumulator to prevent variations in tubing diameter to vary the hydraulic pressure. Each control circuit is protected by a velocity fuse to prevent loss of control due to hose failure. The two (2) sets of five (5) hydraulic cylinders have one (1) pressure control at the panel since the 10 (10) hydraulic cylinders operate at the same hydraulic pressure. This tubing traction system drastically reduces the tubing damage that is normally associated with excessive roller skate assembly hydraulic pressure. The roller skate assemblies use large 2-3/8” diameter roller bearings. The use of these large roller bearings with the new chain and block design ensures that two (2) rollers are in contact with each tubing block prior to transition from one (1) bock to the next at all times. This feature prevents pivoting and clattering of the tubing blocks as they pass over the drive chain sprockets and reduces the stress on the tubing caused by the gripping of the tubing blocks on the tubing. The tubing roller bearings are equipped with full lip seals for greater grease capacity and sealing capability and use large rollers with increased load ratings. 6.0 CHAIN TENSIONING SYSTEM Chain tensioning is achieved by a direct vertical movement of the bottom drive chain idler sprockets by two (2) pairs of hydraulic cylinders powered by a single hydraulic circuit with back-up accumulator for ease of operation. This feature gives a greater range of drive chain tensioning without reducing the drive chain contact on the drive chain drive and idler sprockets and thus increases the life of the drive chains. 7.0 TUBING GUIDE GOOSENECK The Heavy-Duty Tubing Guide Gooseneck is a 90” radius with steel roller straightener lower section and steel rollers on upper section. All bearings with grease zerts. Gooseneck will fold downward for storage by means of a hydraulic cylinder. The cylinder will also act as the stiffener for the tail section of the gooseneck. Heavy-duty pins and hinges on gooseneck. 8.0 GENERAL The injector pivots on one (1) side of the injector frame base, a load cell sensor is installed on the other side of the injector. The pivot bearings are lubricated. The injector is installed in an outer lift frame with steel base, guards, and a four (4) point lifting system, access ladders, and decking of the top of the protection frame. The injector is equipped with a bottom flange connection and adapter for use with a customer furnished 3.06 15M TOT Over/Under stripper/packer assembly. Compression cylinder piping is done in all stainless steel tubing to lesson the likelihood of a control line rupture on location. Velocity fuses are provided in the control circuit lines to prevent loss of control in the event of line failure. Fuse reset valves are provided for each circuit. All hydraulic connections on the injector are piped to a quick disconnect coupling panel, using bulkhead fittings installed at the bottom front side of the injector. All hoses will be supported by chain and hook arrangement so that hose connections do not carry a heavy load. Drain in bottom of drain pan, 1-1/2 NPT. Dual Hydraulic/Electronic load cell attachments Safety belt hooks at top of injector, recessed below plate. Chain attachment padeyes on top four (4) corners of frame, directed inward. Automatic brake release with injector motor pressure. • INCLUDED ITEMS • Gooseneck hair pin/guide post rollers • Fold-down work boards w/ handrails • Tubing odometer • Encoder mounted on brake • Grease manifold upper and lower • Heavy Duty Slings, shackles, and D-ring • 4:1 debooster for measuring wellhead pressure • Hydraulic and Electronic load cells • Fall protector pole HOSE REELS AND HOSES 1.0 DEION Installed on the trailer package will be the following hose reel and hose assemblies: 2.0 TUBING INJECTOR POWER HOSE REEL This will be a two (2) section hose reel hydraulically powered through a chain drive speed reducing arrangement with locally operated direction and speed control valve. This reel will be supplied with bearing and shaft retainers and incorporates a mechanical lock to hold the reel when not in use. This reel is used to hold the two (2) injector power hoses and is equipped with high pressure hydraulic hose swivels and Snaptite (or equivalent) type quick disconnect couplings. 2.1 HOSES Supplied with each unit will be the following hose assemblies: Installed on the Tubing Injector Drive Hose Reel will be the following hoses: - One (1) set of 1-1/2” x 125-ft. long injector drive hoses with quick coupler assemblies 3.0 CONTROL HOSES – FIGURE 8 HOSE RACKS BOP, injector and stripper control hoses will be installed on two (2) figure 8 hose racks mounted at the rear of the trailer: - One (1) only set of 125 ft. long injector control hoses complete with quick coupler assemblies. This bundle will include the injector load cell hose. An electrical cable to connect the electronic load cell will also be part of this bundle. - Two (2) only sets of 125 ft. long stripper packer control hoses complete with quick coupler assemblies bundled with injector control hoses. - Six (6) only sets of 125-ft. long BOP actuator hoses, one (1) for each BOP ram assembly (i.e., pipe ram, slip ram, shear ram, blind ram, and two auxiliaries) complete with quick coupler assemblies. This bundle will include the wellhead pressure signal hose. - Control hoses will be covered with Cordura (or equivalent) protection covering. UNITIZATION & COMPLETION 1.0 DEION Supplied with the unit will be the following standard equipment. (Note: This equipment will be part of above unit, and if already mentioned, an item will not be duplicated.) - Decking on the unit (where required) - Installation of observation lights for 24-hour use - Installation of all other electrical systems - Installation of all pneumatic systems - Installation of all hydraulic systems - All steel and misc. fittings to complete the unit - All labor to complete the unit - Fire extinguisher - General workmanship will be of good quality and appearance. - Snaptite 72 Series quick disconnects are to be used. Unitization and completion shall include but not be limited to the following: - Flame cut edges shall be ground smooth. - Sharp corners and edges to which operators and mechanics are vulnerable shall be ground smooth. - Bolt holes for bolts shall be drilled (not torch cut) no mote than 1/8” larger than the bolt it accepts. - Welds are of good quality and sufficient strength. - Use self-locking nuts where applicable. - No sweated or brazed type hydraulic fittings will be used. - All hoses and connections will be within protective frame and be well secured rubber sleeves to prevent rubbing by frame, etc. - Hydraulic reservoir to be constructed of steel plate with sight level gauge, cleanouts, vent, fill cap, etc. The priming and painting of the equipment to be the customer’s color per Stewart & Stevenson’s standard paint specification, ES-502, latest revision - Complete testing of equipment at Stewart & Stevenson plant in Houston, Texas, USA. Two (2) copies of all relevant test and quality control certificates of the manufacture and testing of all unit functions and parameters will be supplied together with two (2) copies of all required vendor and manufacture test certificates in the English language. - The unit will also be taken to a local test well to test the functionality under normal loads. S&S will provide two technicians for the testing. Testing will be complete when the unit has met contract specifications. Pipe for the test well test will be provided by S&S. TRUCK 2008 KENWORTH T800 4 axle 20K front 20K Drop Axle 24K rear axles CAT C15 550hp RTLO 18918B Dana D52-190P 4.56 ratio P/S, A/C – AM/FM radio CB Radio Hydraulic power pack Kubota generator...
Location: Houston, TX Date Posted: Thursday, April 05, 2018
Condition: Used Price:
view details
For Sale: 2011 KENWORTH TRI DRIVE 40 TON CRANE
33,000 MILES-26,000 HOURS 44 TON MANITEX / 85 FT BOOM, PINTLE HITCH GOOD TIRES DOT CERTIFIED...
Location: TBD Date Posted: Wednesday, February 07, 2018
Condition: GOOD READY TO WORK Price: 180000
view details
For Sale: Pack Off Assemblies, J-29-30
J-29, 1030, (1) Hydra Rig Pack Off J-30, 1032 1033, (2) Pack Off Assemblies ...
Location: Mount Pleasant Michigan Date Posted: Friday, January 19, 2018
Condition: Good Price: Call Jim Davis
view details
For Sale: BOP's For Coiled Tubing Units
J-22, 989 (1) BOP, Quad, W/ Trailer, Ameritrail Equipment T/A 8'W X 24'L Pintle Pull Trailer, 215/75R17.5 Tires, Toolbox J-23, 991, (1) BOP, Texas Oil Tools, 5-1/8"- 15M, Quad, Sgl Outlet W/ SPM 2"- 15M Valve, Studded Top, Flanged Bottom, 2012, (1) 5-1/8"- 15M Single, Flanged Top and Bottom, 2007, (1) Drilling Spool, 5-1/8"- 15M X 23" H With (2) Outlets, (4) Blocks, (2) Hyd Actuated Valves J-24, 994, (1) BOP, Forum 5-1/8"- 10M, Quad, Sgl 2" Outlet, Studded Top, Flanged Bottom, Lifting Plug and Stand, 2011 J-25, 995, (1) BOP, Texas Oil Tools, 5-1/8"- 15M, Stack, (1) Quad W/ Sgl2" Outlet, Studded Top, Flanged Bottom, 2009, (1) Single, Flanged Top and Bottom, 2009, (1) Drilling Spool 14"H W/ (2) 2" Outlets, (2) 2" Valves, (2) Hyd Actuated Valves J-26, 1004, (1) BOP, Forum 3-1/16"- 10M, Quad, Sgl 1-7/8" Outlet, Studded Top, Flanged Bottom, W/ Stand J-27, 1007, (1) BOP, Quad J-28, 1011, (1) BOP, Forum, 5-1/8"- 10M, Double, Studded Top, Flanged Bottom Contact: Jim Davis 281-444-0102 ...
Location: Mount Pleasant Michigan Date Posted: Friday, January 19, 2018
Condition: Good Price: Call Jim Davis
view details
For Sale: Injector Heads, Hydra Rig HR680 Tubing Injector, J-15
J-15 (3) Injector Heads, Hydra Rig HR680 Tubing Injector, 2010 & 2011, 90" Coil Tubing Gooseneck Contact: Jim Davis 281-444-0102 email: sales@davisrigequipment.com ...
Location: Mount Pleasant Michigan Date Posted: Friday, January 19, 2018
Condition: Very Good Price: Call Jim Davis
view details
For Sale: NOV Fire Vaporized Nitrogen Trailer, J-14
J-14 (1) NOV Fire Vaporized Nitrogen Trailer, 2010, SR-97 Triplex Cryogenic Pump, 2.25, 8,900-PSI Cold End, P/B Detroit R1238K40 Engine W/ Allison Trans, Side Mounted Control Panel, Mixing Tank W/ Hydraulic Colling System, Mercedes 6-Cyl Diesel Engine, 1,895-Gal Nitrogen Tank, Mtd on 2011 EMI Tandem Spread Axle Trailer, 1,574 Hours on Pump Eng, 1,836 Hours on Aux Eng Contact: Jim Davis 281-444-0102 email: sales@davisrigequipment.com ...
Location: Mount Pleasant Michigan Date Posted: Friday, January 19, 2018
Condition: Very Good Price: Call Jim Davis
view details
For Sale: NOV Nitrogen Combination Units, J-08-13
J-08 (1) NOV Nitrogen Combo Trailer, 2013, BJ Pacemaker Triplex Pump, 3.5" Plungers, 15,000-PSI, P/B (2) Cat C-18 Diesel Engines, (1) Alisson Trans, (1) W/ Hydraulic Motor for Hydraulics, (2) Mission Magnum Sandmaster 3" X 4" Centrifugal Pumps P/B Hydraulic Motors, Control Cab, Triplex Cryogenic Pumps, 10-BBL Mixing Tank, 1,895 Nitrogen Tank, 150-Gal Saddle Tank, Mtd on 2013 JET Tandom Spread Axle Trailer, Engine 1,031 Hours, Fluid Eng 829 Hours, Location Houston TX J-09 (1) NOV Nitrogen Combo Trailer, 2008, Western Rough Rider 500 Triplex Pump W/ Gardner Denver 20,000-PSI Fluid End, P/B (2) Detroit Series-60 Diesel Engines, (1) Allison Trans, (1) W/ Hydraulic Motor for Hydraulics, (2) Mission 3" X 4" Centrifugal Pumps P/B Hydraulic Motors, Control Cab, Triplex Cryogenic Pump, 10-BBL Mixing Tank, 1,895-Gal Nitrogen Tank, (2) 150-Gal Saddle Tanks, Mtd on 2008 EMI Tandem Spread Axle Trailer, 2,022 Hours on N2 Eng, 1,739 Hours on Fluid Eng, Location Mount Pleasant Michigan J-10 (1) NOV Nitrogen Combo Trailer, 2007, Western Rough Rider 500 Triplex Pump W/ Gardner Denver 20,000-PSI Fluid End, P/B (2) Detroit Series-60 Diesel Engines, (1) Allison Trans, (1) W/ Hydraulic Motor for Hydraulics, (2) Mission 3" X 4" Centrifugal Pumps P/B Hydraulic Motors, Control Cab, Triplex Cryogenic Pump, 10-BBL Mixing Tank, 1,895-Gal Nitrogen Tank, (2) 150-Gal Saddle Tanks, Mtd on 2007 EMI Tandem Spread Axle Trailer, 4,153 Hours on N2 Eng, 3,520 Hours on Fluid Eng, Location Mount Pleasant Michigan J-11 (1) NOV Nitrogen Combo Trailer, 2006, SPM Triplex Pump, P/B (2) Detroit Series-60 Diesel Engines, (1) Allison Trans, (1) W/ Hydraulic Motor for Hydraulics, (2) Mission 3" X 4" Centrifugal Pumps P/B Hydraulic Motors, Control Cab, Triplex Cryogenic Pump, 10-BBL Mixing Tank, 1,895-Gal Nitrogen Tank, (2) 150-Gal Saddle Tanks, Mtd on 2005 Atoka Tandem Spread Axle Trailer, 1,986 Hours on N2 Eng, 4,458 Hours on Fluid Eng, Location Mount Pleasant Michigan J-12 (1) NOV Nitrogen Combo Trailer, 2006, Western Rough Rider 500 Triplex Pump W/ Gardner Denver 20,000-PSI Fluid End, P/B (2) Detroit Series-60 Diesel Engines, (1) Allison Trans, (1) W/ Hydraulic Motor for Hydraulics, (2) Mission 3" X 4" Centrifugal Pumps P/B Hydraulic Motors, Control Cab, Triplex Cryogenic Pump, 10-BBL Mixing Tank, 1,895-Gal Nitrogen Tank, (2) 150-Gal Saddle Tanks, Mtd on 2006 Atoka Tandem Spread Axle Trailer, 2,245 Hours on N2 Eng, 1,351 Hours on Fluid Eng, Location Mount Pleasant Michigan J-13 (1) NOV Nitrogen Combo Trailer, 2006, Western Rough Rider 500 Triplex Pump W/ Gardner Denver 20,000-PSI Fluid End, P/B (2) Detroit Series-60 Diesel Engines, (1) Allison Trans, (1) W/ Hydraulic Motor for Hydraulics, (2) Mission 3" X 4" Centrifugal Pumps P/B Hydraulic Motors, Control Cab, Triplex Cryogenic Pump, 10-BBL Mixing Tank, 1,895-Gal Nitrogen Tank, (2) 150-Gal Saddle Tanks, Mtd on 2006 Atoka Tandem Spread Axle Trailer, 3,244 Hours on N2 Eng, 4,293 Hours on Fluid Eng, Location Mount Pleasant Michigan ...
Location: See Below Date Posted: Friday, January 19, 2018
Condition: Very Good Price: Call Jim Davis
view details
For Sale: NOV Coiled Tubing Units With CTU Tractors, J-01-07
J-01, Lot 804 (1) NOV Coiled Tubing Unit, W/ Hydra Rig 680 Injector, 90" Tubing Guide and Pack Off Assembly, 8'W X 10L Control Cab, (4) Hose Reels W/ Hydraulic Hose, Mtd On 2012 EMI/ATOKA 8'W X 42'L 3-Axle Lowboy W/ Air Ride Suspension, Location Mount Pleasant Michigan J-02, Lot 805 (1) NOV Coiled Tubing Unit (Unused), W/ 2011 Hydra Rig 680 Injector, 90" Tubing Guide, 12' X 71" Tubing Reel, 13' X 8' Control Cab, (2) Hose Reels W/ Hydraulic Hose, Mtd On 2011 Peerless 8-1/2' X 50' 4-Axle Trailer W/ Air Ride Suspension, W/ Lot 896, Used CTU Tractor, Peterbuilt 367, 2010, P/B Cummins ISX 15.0L 500-HP Diesel Engine, Eaton Trans, Eng Brake, DEF, DPF, Air Cab, PTO, 22,700#, Air Lift 3rd Axle, Dbl Frame, Chalmers RB Over WB Suspension, 244"WB, 150-Gal Fuel Tank, Hydra Rig Hyd Unit, Synchronous Generator P/B Kubota 4-Cyl Eng, Location Houston TX J-03, Lot 806 (1) NOV Coiled Tubing Unit, W/ 2011 Hydra Rig 680 Injector, 90" Tubing Guide and Pack Off Assembly, 12' X 78" Tubing Reel, 8' X 8-1/2' Control Cab, (4) Hose Reels W/ Hydraulic Hose, Mtd On 2011 Loadcraft 8-1/2' X 56' 4-Axle Trailer W/ Air Ride Suspension, Built By Total Equipment Co in Ft Worth, W/ Lot 900, CTU Tractor, Peterbuilt 367, 2011, 37,909 Miles, P/B Cummins ISX 15.0L 500-HP Diesel Eng, Eaton Trans, Eng Brake, DEF, DPF, Air Cab, Air Lift 4th Axle, Dbl Frame, Air Trac Susp, 288"WB, Alum Wheels, 150-Gal Fuel Tank, 100-Gal Fuel Tank, Hydra Rig Hyd Unit, Generator P/B 4-Cyl Diesel Eng, Location Fort Worth TX J-04, Lot 809 (1) NOV Coiled Tubing Unit, W/ 2011 Hydra Rig 680 Injector, 90" Tubing Guide, 12' X 78" Tubing Reel, 8' X 9' Control Cab, (4) Hose Reels W/ Hydraulic Hose, Mtd On 2011 Loadcraft 8-1/2' X 53' Trailer W/ Air Ride Suspension, W/ Lot 897, CTU Tractor, Peterbuilt 367, 2012, P/B Cummins ISX 15.0L 500-HP Diesel Eng, Eaton Trans, Eng Brake, DEF, DPF, Air Cab, Air Lift 4th Axle, Air Trac Susp, Alum Wheels, 150-Gal Fuel Tank, 100-Gal Fuel Tank, Hyd Unit, Onan Generator, Location Mount Pleasant Michigan J-05, Lot 810 (1) NOV Coiled Tubing Unit, W/ Hydra Rig 680 Injector, 90" Tubing Guide and Pack Off Assembly, 8' X 10' Control Cab, (4) Hose Reels W/ Hydraulic Hose, Mtd On 2009 EMI/ATOKA 4-Axle Lowboy W/ Air Ride Suspension, W/ Lot 940, CTU Tractor, Peterbuilt 367, 2012, 12,792 Miles, P/B Cummins Diesel Eng, Eaton Trans, Air Ride Cab, PTO, Air Lift 3rd Axle, 246"WB, (4) Accumulater Bottles, 425/65R22.5 Front Tires, 11R22.5 Rear Tires, 295/75R22.5 Tag Tires, Hydra Rig Hyd Unit, Generator P/B 4-Cyl Eng, Location Mount Pleasant Michigan J-06, Lot 811 (1) NOV Coiled Tubing Unit, W/ 2010 Hydra Rig 680 Injector, 90" Tubing Guide and Pack Off Assembly, Reel W/ 2" Tubing, 9' X 8' Control Cab, (3) Hose Reels W/ Hydraulic Hose, Mtd On 2008 EMI/ATOKA 8'-6"W X 48'L 4-Axle Trailer W/ Air Ride Suspension, W/ Lot 898, CTU Tractor, Peterbuilt 367, 2010, 18,934 Miles, P/B Cummins ISX500 Diesel Eng, Eaton Trans, Air Cab, PTO, Air Lift 3rd Axle, 246"WB, (4) Accumulator Bottles, 425/65R22.5 Front Tires, 12R22.5 Rear Tires, Hydra Rig Unit, Generator P/B 4-Cyl Eng, Location Fort Worth TX J-07, Lot 812 (1) NOV Coiled Tubing Unit, W/ 2004 Hydra Rig 560 Injector, 90" Tubing Guide, 12' X 72" Tubing Reel, 8' X 8' Control Cab, (3) Hose Reels W/ Hydraulic Hose, Mtd On 2008 EMI/ATOKA 8'-6"W X 52''L 4-Axle Trailer W/ Air Ride Suspension W/ Lot 947, CTU Tractor, Peterbuilt 367, 2010, 68,566 Miles, P/B Cummins ISX 15.0L 500-HP Diesel Eng, Eaton Trans, Eng Brake, DEF, DPF, Air Ride Cab, Air Lift 3rd Axle, Dbl Frame, Chalmers RB Over WB Suspension, 244"WB, 150-Gal Fuel Tank, Hydra Rig Hyd Unit, Harrison 15-KW Generator, Location Fort Worth TX Contact: Jim Davis 281-444-0102 email: sales@davisrigequipment.com ...
Location: See Below Date Posted: Friday, January 19, 2018
Condition: Very Good Price: Call Jim Davis
view details
For Sale: TWIN 1000 HP SPM PUMP TRAILER
) 2010 SPM (2) TWS 950HP Triplex pumps. Detroit 12V2000 Turbo Charged Intercooled Diesel Engine. Allison CLT 6061 Automatic Transmission. Steel Fluid End, Suction and Discharge Manifold, Lubrication System, Relief Valves, TC682 Gear Reduction Box, PTO, Hydraulic System w/Pump, Hydraulic Reservoir, Twin 11-Barrel Stainless Steel Displacement Tanks, Centrifugal Mixing and Transfer Pumps, Each p/b Hydraulic Motor, All Required Plumbing, Lines, Valves, Operator’s Control Cabin w/Desktop, SES Controls, Remote Controls, Electrical Outlets, Flow Chart Recorder, Lighting, All Mounted on 2010 48’L Tri-Axle Trailer, w/(4) Fuel Tanks, Fuel Lines. 3.75" plungers. Driver's side engine has 320 hours and passenger side has 119 hours (as of May 24, it has worked 3 jobs since)...
Location: TEXAS Date Posted: Friday, August 11, 2017
Condition: Good Ready to Work Price: $600,000 obo
view details
For Sale: Unit OF-119: 2007 Total Equipment & Service 2-inch coiled tubing unit
Used Total Equipment & Service 2" coil tubing unit A cost- and time-effective solution for well intervention operations employs coiled tubing. Instead of removing the tubing from the well to fix a problem like a workover rig, coiled tubing is inserted into the tubing against the pressure of the well and during production. The coiled tubing is a continuous length of steel or composite tubing that is flexible enough to be wound on a large reel for transportation. The coiled tubing unit is composed of a reel with the coiled tubing, an injector, control console, power supply and well-control stack. The coiled tubing is injected into the existing production string, unwound from the reel, and inserted into the well. The advantage of coiled tubing over conventional straight tubing Is the fact that coiled tubing does not have to be screwed together, and does not require a workover rig. Because coiled tubing is inserted into the well while production is ongoing, it is also a cost-effective choice and can be used on high-pressure wells. Specs: Length: 53' Width: 8' 5" Height: 13' 6" Cabin features: Custom built cabin manufactured with top of the line materials Custom paint and full vinyl wrap Low profile LEDs and textured floors Fully customized console controls Reel features: Trailer mounted Built-in tubing reel brake safety Tubing data acquisition control system & software Two-part drive gear to increase serviceability without reel removal Injector features: Max speed of 220ft/min Independent repositionable drives Runs 200ft/min at 50,000 lbs Patent pending 11/4”-2 7/8” mono gripper blocks 3 stage planetary reduction boxes...
Location: Houston, TX Date Posted: Wednesday, June 21, 2017
Condition: Used Price:
view details
For Sale: 2 INCH COILED TUBING ASSETS FOR SALE
2008 K.enworth Model T800, VIN xxxxxxxxxxxxxx. Heavy duty,3 axle, pto driven hydraulic unit/lines to trailer and Kubota OLl 1000 generator.Odometer indicates 140k miles 2008 Stewart Stevenson Mode11T100.HC skidded power unit, SN. xxxxxxxxxxxxxx; 100k lb.injector head; tubing reel unit w/2"coil tubing; BOP; control room, etc.mounted on Stewart Stevenson heavy duty drop deck trailer, VIN xxxxxxxxxxxxxx 2008 Stewart Stevenson Model WTt 002,SN.WTl xxxxxxxxxxxxxx; twin Detroit Diesel engines, (2) Stewart Stevenson triplex pumps/fluid ends; 2008 Mertz 203060740 trailer,VIN xxxxxxxxxxxxxx 2008 Stewart Stevenson Model NT-181-NF, SN. NT185763755020708; Cryogenic Vessel Alt. 2.8-4.5-TM tank, Detroit Diesel power, Lufkin 48' trailer,VIN xxxxxxxxxxxxxx 2008 Kenworth Model T800, VIN xxxxxxxxxxxxxx 1488. Heavy duty, 3 axle, pto driven hydraulic unit/lines to trailer and generator (less generator unit). Odometer reads 126k miles 2008 Stewart Stevenson Model Tf l00-HC skidded power unit, SN.xxxxxxxxxxxxxx; 10Ok lb.injector head; tubing reel unit w/2" coil tubing; BOP; control room, etc. motmted on Stewart Stevenson heavy duty drop deck trailer, VIN xxxxxxxxxxxxxx 2008 Stewart Stevenson Model WTl 002, SN.WTl xxxxxxxxxxxxxx; twin Detroit Diesel engines, (l) SPM WS-600 triplex pmnp/fluid end, (1) MSI Triplex pump/fluid end; 2007 Mertz 203060740 trailer, VIN xxxxxxxxxxxxxx 2008 Stewart Stevenson Model NT-181-NF, SN. xxxxxxxxxxxxxx; Cryogenic Vessel Alt 2.8-4.S-TM tank, Detroit Diesel power, Lufkin 48'trailer, VIN xxxxxxxxxxxxxx 2 COMPLETE SPREADS INCLUDING 1 BOP THERE ARE SOME REPAIRS ON UNITS THAT WILL BE REQUIRED BEFORE PUTTING THEM TO WORK. STEWART AND STEVENSON HAS QUOTE $350,000.00 PER COIL UNIT TO REPAIR AS NEEDED. BANK REPO $900,000.00 BUYS ALL 8 PIECES 2 TRACTORS 2 CT UNITS 2 TWIN PUMP TRAILERS 2 NITROGEN UNITS...
Location: LOUISIANA Date Posted: Wednesday, March 29, 2017
Condition: USED Price: $900,000.00
view details
For Sale: Coiled Tubing Reeler
Skidded Coiled tubing reeler to accomopdate 13 ft dia x @ 6'9" spool. Includes hyd. motor drive, attached 2" swivel joints. Ex Schlumberger. Missing level winder.. Gooseneck extra. ...
Location: So. La. Date Posted: Thursday, March 16, 2017
Condition: Used-Good Price: $7,000
view details
For Sale: Cryogenic Pump Skid
Coiled Tubing Cryo pump skid unit 10k / 180 scfm Cryogenic LN2/GN2 High Pressure Skid Driven by six cylinder Caterpillar . via twin hydraulic pumps. Mesabi waste heat recovery (cogen) system to nitrogen vaporizer system. Autoclave valves, Altronic meters, Barton meter, M.d. press indicators (15k) All stainless plumbing on cryogenic flow lines. Wgt. Aprox 8,000 lb.. Meas.: 8'x8'x12'6", Missing h.p. triplex cryogenic pump. All aluminum frame ...
Location: So. La. Date Posted: Sunday, November 13, 2016
Condition: Triplex deleted Price: SOLD
view details
For Sale: Coiled Tubing Reeler
Coiled Tubing Reeler Hydraulic Drive...
Location: So. La. Date Posted: Tuesday, November 01, 2016
Condition: Good Price: POR
view details
For Sale: Coiled Tubing Operators Console
Coil Tubing Jack Up operators console. Aluminum with steel base. With 4' jackup cylinders. Requires much of instrumentation reinstallation. Has working rear mount air condition. Structure is sound but requires some refurb.. Aprox measurement: 7' w x 7'4 ceiling x 11' lg. Weight: Aprox. 6,000 lb ...
Location: So. La. Date Posted: Tuesday, October 11, 2016
Condition: Good Core Price: POR
view details
For Sale: CRYOGENIC PUMP WANTED
Wanted Triplex 10 k plus 180 scfm Cryogenic pump....
Location: SO. LA. Date Posted: Sunday, September 18, 2016
Condition: GOOD Price: Working Surplus
view details
For Sale: Poly-Blender 30 parrel
Poly-Blender Two vertical 5/8" wall eurethane compound tanks with steel outer wall and frame. Hydraulic variable speed mixer/agitator plenum tank...
Location: So. La. Date Posted: Thursday, August 18, 2016
Condition: Good Price: POR
view details
For Sale: TOT COIL TUBING BOP RAMS
1- LOT DIFFERENT SIZE TOT COIL TUBING RAMS EMAIL; SALES@OILFIELDSWIVELINC.COM OR CALL...
Location: LOUISIANA Date Posted: Tuesday, May 03, 2016
Condition: GOOD USED Price: NEGOTIABLE
view details
For Sale: Snubbing Unit Head, N-02
N-02, Snubbing Unit Head, Texas Equipment & Service Co, Model 57-PRU-4301, S/N TE558-03, MFG Date 9-13-00 ...
Location: Houston TX Date Posted: Wednesday, February 10, 2016
Condition: Good Price: Call Jim
view details

>> Do you have surplus equipment to sell?  Post an ad on Rigzone.com and start receiving leads today.

Applied Machinery Corporation           Victory Equipment Sales

SRG International, LLC           Energy Asia Group Pte Ltd

MasterRig           American Block

JB Oilfield           Freemyer Industrial Pressure

Texas International Oilfield Tools, LTD          
view all featured companies
become a featured company
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE